ElasticBLAST Control Plane

Run large BLAST searches on Azure without becoming the cloud operator.

Key Facts

  • What it is: a browser-only control plane for ElasticBLAST on Microsoft Azure.
  • Where it runs: one Azure Container App named ca-elb-dashboard with six sidecars (frontend, api, worker, beat, redis, terminal); BLAST jobs run on Azure Kubernetes Service.
  • How users sign in: MSAL.js (Auth Code + PKCE) in the browser; the backend reaches Azure as a user-assigned managed identity. No client secrets.
  • Storage posture: every workload Storage account stays publicNetworkAccess: Disabled; browser query and result traffic is API-mediated. No SAS tokens are issued to the browser.
  • Open source: MIT licensed at github.com/dotnetpower/elb-dashboard.

ElasticBLAST is built for serious sequence search, but the cloud work around it can pull a researcher away from the question they actually care about. Clusters, storage accounts, container images, database preparation, permissions, and job logs all have to line up before a search can run well.

ElasticBLAST Control Plane brings those moving parts into one browser workflow. It helps research teams prepare the Azure workspace, check readiness, submit BLAST jobs, monitor progress, and find results without turning every search into an infrastructure session.

Use it when a query has outgrown a local workstation, but the team still needs a calm, visible path from input sequence to completed result.

For example, a researcher can bring a FASTA query to the dashboard, confirm that the Azure workspace is ready, submit the search, and return to results without learning the underlying cluster, Storage, image, and job-control commands first.

Start with Get Started See the Architecture

ElasticBLAST on Azure

ElasticBLAST on Azure is the Azure-portable runtime this dashboard automates. It adapts ElasticBLAST execution to Azure infrastructure; ElasticBLAST Control Plane adds the browser workflow for preparing, running, monitoring, and retrieving those jobs.

Who It Is For

Use this control plane when a research team needs to run repeatable BLAST work on Azure, but does not want every researcher to learn the deployment topology, storage network rules, command-line flags, and result file layout before they can ask a biological question.

It is especially useful when:

  • Searches are too large or too frequent for a workstation.
  • Multiple people need the same readiness view, job history, and result access path.
  • Operators need Azure controls, but researchers need a browser-first workflow.
  • The team wants private Storage access without handing browser clients direct Storage URLs or SAS tokens.

Before And With The Control Plane

Without the control plane With ElasticBLAST Control Plane
Researchers assemble local commands, environment variables, and file paths before each run. Researchers submit from a browser workflow with the active Azure workspace already visible.
Operators check cluster, storage, images, database preparation, and logs across separate tools. The Dashboard brings readiness signals into one place before work is submitted.
Result files have to be found, downloaded, and shared through storage tooling. Results stay behind the control plane and are streamed through the API sidecar.
Failures often mean switching context into Azure, Kubernetes, storage, and terminal sessions. Job state, degraded signals, logs, and advanced terminal access stay reachable from the same browser session.

What It Helps With

  • Replace scattered pre-flight checks with one Dashboard readiness view for compute, storage, runtime images, BLAST databases, and terminal access.
  • Start BLAST searches from the browser instead of assembling commands across local terminals.
  • Follow running jobs in one place, including degraded or failed states that need attention.
  • Keep query uploads and result downloads inside the control plane without exposing Storage links directly to the browser.
  • Leave the browser terminal available for advanced workflows without making it the default path.
  • Give maintainers a documented path into the architecture, deployment, authentication, and troubleshooting details.

The Dashboard is the main pre-flight surface. It shows whether the workspace is ready enough to submit work, then keeps BLAST Jobs, degraded states, and follow-up actions visible after submission.

Dashboard cluster plane with AKS status, recent BLAST jobs, and database readiness

Cluster readiness, BLAST Jobs, and database preparation stay visible before a researcher submits work.

Dashboard resource plane with Azure Container Registry, Storage Account, and terminal status

Resource cards collect the Azure services that usually require separate portal or CLI checks.

Dashboard sidecar runtime with frontend, API, Redis, worker, beat, and terminal health

Runtime monitoring shows whether the bundled sidecars that keep the browser workflow alive are healthy.

A Researcher-First Workflow

  1. Open the Dashboard and choose the active Azure workspace.
  2. Check whether the required compute, storage, images, and databases are ready.
  3. Submit a BLAST search from the browser.
  4. Watch progress from BLAST Jobs.
  5. Open, inspect, and download results when the job completes.

The goal is not to hide Azure. It is to keep Azure in the background until it matters.

Why It Is Different

  • One Azure Container Apps deployment bundles the frontend, API, worker, scheduler, Redis broker, and browser terminal sidecars.
  • Azure calls use managed identity, so the browser token is used for user identity rather than being forwarded as an Azure control-plane credential.
  • Inline queries are staged by the API, result files stream through it, and previews arrive as bounded API responses; the browser does not receive direct Azure Storage URLs or SAS tokens.
  • The browser terminal remains available for advanced az, kubectl, azcopy, and elastic-blast workflows, but the default research path stays in the UI.

Start Here

If you are new to the project, start with Get Started. It keeps the first path short: deploy, sign in, check readiness, and run a first BLAST smoke test.

If you are already operating an environment, use these entry points:

  • User Guide shows how to operate the control plane from the browser.
  • Dashboard explains the readiness view and the signals to check before submitting work.
  • Deployment Reference keeps the detailed deployment, validation, and troubleshooting notes for maintainers.
  • Change Log lists recent feature notes and keeps the implementation history searchable.

For Platform Maintainers

  • High Level Architecture gives the first-pass system map: browser, Container App sidecars, Azure resource plane, AKS workload plane, storage, identity, and job flow.
  • Container Apps Migration describes the six-sidecar deployment architecture.
  • Deployment Reference covers manual azd deployment, redirect URI setup, smoke testing, network lockdown, and cleanup.
  • Auth explains browser sign-in and backend token validation.
  • BLAST SearchSP Discovery tracks SearchSP compatibility work.
  • Web BLAST Compatibility Plan describes the web compatibility implementation plan.
  • The Agent Reference section documents the repository layout, browser terminal, resource plane, monitoring UI, and Dashboard UI conventions.

Documentation Capture

  • Screenshot Workflow defines the repeatable capture process, viewports, masking rules, and acceptance checks for future documentation screenshots.

Source Repository

The source lives at dotnetpower/elb-dashboard. Some internal reference pages link to source files in that repository.

Frequently Asked Questions

What does ElasticBLAST Control Plane do?

It gives research teams a browser-only workflow for running ElasticBLAST sequence-similarity searches on Microsoft Azure. Researchers submit jobs, monitor AKS workloads, and retrieve results from a web dashboard without using SSH, local CLIs, or browser-issued SAS tokens.

How does it run on Azure?

The control plane is a single Azure Container App named ca-elb-dashboard with six sidecars: frontend (React/Vite SPA on nginx), api (FastAPI on uvicorn), worker and beat (Celery), redis (in-revision broker), and terminal (loopback ttyd with the elastic-blast toolchain). BLAST jobs themselves run on Azure Kubernetes Service (AKS).

How do users sign in, and how does the backend reach Azure?

Browser users sign in with MSAL.js using the Auth Code + PKCE flow. The backend validates the bearer token only for identity verification — every Azure SDK call is made as the user-assigned managed identity id-elb-dashboard-* via DefaultAzureCredential. There are no service principal secrets and no on-behalf-of (OBO) flows.

Are SAS tokens issued to the browser?

No. Every workload Storage account stays publicNetworkAccess: Disabled; inline query input is staged by the api sidecar, and result-file downloads stream through it with a process-local semaphore (eight permits by default). The browser never receives a SAS URL or connects to a Storage endpoint.

Who actually downloads BLAST databases from NCBI — the api sidecar, the terminal sidecar, or AKS?

The api sidecar's POST /api/storage/prepare-db route orchestrates both paths. The default path issues per-file Azure Blob server-side copies (start_copy_from_url) or an AKS azcopy fan-out from the public NCBI BLAST S3 mirror into the workload Storage account's blast-db container. When an official NCBI release has not reached S3 and the deployment explicitly enables NCBI Direct (HTTPS), an AKS Indexed Job downloads pinned archives, verifies their official MD5 values, stages a generation-specific prefix, and promotes it only after every file and shard layout passes validation. The browser and terminal sidecar never carry the database bytes.

Does it support AWS or GCP?

No. The upstream ElasticBLAST supports multiple clouds, but this control plane is Azure-only by charter. See the High Level Architecture page for the boundaries.

What is the deployment workflow?

A single azd up from a fresh clone provisions the Bicep stack, builds the container images with az acr build, and swaps the Container App template to the six-sidecar layout via postprovision.sh. The Get Started page walks through it end to end.